My Christmas present is now installed! Patrick finished it in about 2.5 hours--I'm very proud of him.
Here's a pic of after he cut out the existing pipes with the sawsall (the black thing on the floor is the disposal):
Here's a pic of after he cut out the existing pipes with the sawsall (the black thing on the floor is the disposal):
Here's a pic with the disposal installed and all new piping:
1 comment:
Nice use of the decimal point!
Looks like the Badger 9 there.
tuff sumbuck disposal :]
Post a Comment